Production and Storage Facility

  • Client: ATC Engineering
  • Location: The second of the company’s two sites, enabling the expansion of their operations. (Ampflwang im Hausruckwald, Austria)
  • Connection to a Reference Project: The client chose us due to a positive experience with the adjacent HAFO building, also a Schwarzmann hall, praised for its quality and functionality.

Project Description:
A purpose-built production and storage hall featuring:

  • Integration with infrastructure: Connected to the fire wall and office building for seamless integration.
  • Economical structural elements: Columns and beams optimized for cost-efficiency.
  • Elevator: Simplifies material handling and enhances internal logistics.

Design and Implementation:

  • Collaboration with an architect: Tailored solutions were developed to meet the specific requirements of the site and use.
  • Preparation for solar panels: The roof is designed to accommodate a solar power system, which the client plans to lease to a third party.

Key Benefits for the Client:

  • A new location enabling an expanded offering and greater operational flexibility.
  • A functional hall designed to integrate production and storage.
  • Efficient connection to existing infrastructure, enhancing synergy and optimizing costs.